Construction of linear facilities

We guarantee the quality of work performed and respect for the environment

  • 50+ km
    annually
  • 5+ years
    experience

We carry out the construction of main, field, infield pipelines in oil and gas fields. We carry out a full range of works from design and ending with the delivery of the object to the Customer

Технологии

  • Preparatory work

    • clearing the route for the construction of pipelines
    • prominka along the highway
    • installation of decks, deforestation
  • Pipeline installation

    • earthworks (trench development)
    • pipeline welding
    • non-destructive testing of welded joints
    • carrying out hydro- and thermal insulation works
    • cleaning, testing pipelines
    • installation of the pipeline in a trench using balancing weights 
  • Installation of shutoff valve units, pipeline cleaning and diagnostic facilities

    • backfilling of stop valve sites
    • pile foundation 
    • installation, welding of valves
    • hydro and thermal insulation works
    • production and installation of enclosing structures
  • Installation of the power supply system at UZA, SOD

    • installation of power lines
    • installation of load-bearing structures (racks, shelves, trays)
    • installation of cable and wiring products
    • installation of electric heating system for pipelines
    • commissioning of power supply equipment
  • Installation of instrumentation and A systems at UZA, SOD

    • installation of load-bearing structures (racks, shelves, trays)
    • installation of cable and wiring products
    • installation, connection of equipment 
    • equipment commissioning
  • Improvement of construction sites

    • earthworks
    • backfilling of sites, shutoff valves
    • installation of enclosing structures
    • removal of logging residues
    • reclamation of construction sites

We have the necessary technical resources, as well as highly qualified personnel with extensive experience and meeting the requirements of supervisory authorities. At all stages we carry out quality control of construction and installation works. The applied technologies of welding and anti-corrosion protection allow us to guarantee the durability of operation in the conditions of the Far North.

Completed projects

Construction of pipeline transport facilities

Ulyanovsk

2023

Customer: UMUP "Ulyanovskvodokanal"

Overhaul of the centralized water disposal system in Krotovka settlement, Ulyanovsk region.

Construction of pipeline transport facilities

Krasnodar region

2022

Customer: Chernomortransneft LLC

Reconstruction of a section of the main oil pipeline "Tikhoretsk-Tuapse-2".

Construction of pipeline transport facilities

KhMAO

2021-2022

Customer: JSC "Transneft-Siberia"

Reconstruction of the section of the main oil pipeline "Nizhnevartovsk-Kurgan-Kuibyshev" 217 km - 284 km.

Construction of pipeline transport facilities

KhMAO

2021-2022

Customer: JSC "Transneft-Siberia"

Reconstruction of the section of the main oil pipeline "Surgut-Polotsk" 342 km - 380 km.

Construction of pipeline transport facilities

KhMAO

2021-2022

Customer: JSC "SiburTyumenGaz"

Reconstruction of the main product pipeline "Gubkinsky GPP-Yuzhno-Balyksky GPP".

Construction of an additional reserve line 22 km, incl. 10 km in wetlands

Construction of pipeline transport facilities

KhMAO

2020-2022

Customer: RN-Yuganskneftegaz, OOO

Construction of oil pipelines, construction of oil and gas gathering networks at the fields: Ust-Balykskoye, Solkinskoye, Priobskoye, Yuzhno-Surgutskoye, Vostochno-Pravdinskoye. The total length is over 100 km.

Construction of pipeline transport facilities

Krasnoyarsk region

2018

Customer: SUZUN JSC

Construction of infield pipelines.

Construction of pipeline transport facilities

KhMAO

2017

Customer: Gazpromneft-Khantos, OOO

Arrangement of the Maloyugansky site for trial operation. Construction of a pipeline for the oil and gas gathering of the Maloyugansky field.

Construction of pipeline transport facilities

Krasnoyarsk region

2015

Customer: SUZUN JSC

Construction of an interfield oil pipeline OPF of the Suzunskoye field - CPS of the Vankor field