Site preparation of well pads and access roads
We carry out works of any category of complexity
-
200 million ₽annual investment in development
-
2 600K+m3 of dumping per year
Технологии
-
We carry out a complex of construction works
- Engineering surveys and design taking into account the natural terrain
- Clearing the area for the future site
- Filling well pads and site objects with inert materials with layer-by-layer compaction with vibratory rollers
- The device of embankment along the perimeter of the well pad and the arrangement of entrance ramps. (We do not install valves!)
- Construction and arrangement of sludge pits with impervious screen
- Road construction / roadways, infield roads, winter roads
Construction work is carried out around the clock during the calendar year, including during periods of low temperatures and spring floods. We use special road construction technologies: laying a heat-insulating layer and installing a reinforcing cage made of non-woven-synthetic material, strengthening slopes using spatial geogrids, and installing culverts from corrugated pipes with a diameter of up to 4 meters.
Our own fleet of dump trucks and road construction equipment ensures the necessary speed and quality of construction with the implementation of all environmental protection measures.