Projects

We carry out projects of any complexity for the benefit of Man

  • 4000+
    projects
  • 1.3 billion ₽
    annual investment in development

Construction of crossings using trenchless technologies

Suzunskoye field

Krasnoyarsk region

2018-2022

Customer: JSC "Suzun"

Arrangement

Transitions made - 9
Total length - 4 312 m
Pipe diameter -1020 mm

The construction was carried out beyond the Arctic Circle in the permafrost zone, in a poorly developed area with a lack of permanent transport communications and communications.

Zapadno-Messoyakhskoye field

YaNAO

2020

Customer: JSC "Messoyakhaneftegaz"

Arrangement

Transitions made - 1
Total length - 900 m
Pipe diameter - 820 mm

The world's northernmost directional drilling crossing.
The company SP VIS-MOS" LLC has set a world record in construction by the method of directional drilling (HDD). In the Arctic, the construction of the northernmost not only in Russia, but also in the world, underwater crossing of the oil pipeline across the Messoyakha River on the Gydan Peninsula in the Yamalo-Nenets Autonomous Okrug was completed using horizontal directional drilling technology. "

Kharampur field

Yamalo-Nenets Autonomous Okrug

2019-2020

Customer: LLC "Kharampurneftegaz"

Arrangement

Transitions made - 4
Total length - 3713 m
Pipe diameter -1220 mm

The work was carried out in particularly unfavorable geological conditions, which make the work as difficult as possible due to the predominance of permafrost soils.

Severo-Russkoye field

YaNAO

2018-2019

Customer: Novatek-Tarkosaleneftegaz LLC

Arrangement

Transitions made - 13
Total length - 8 659 m
Pipe diameter -1220 mm, 820 mm, 530 mm

Work on the construction of crossings on the territory of the Severo-Russkoye field was carried out in the zone of permafrost soils of a heterogeneous structure, which required the use of modern navigation equipment, which makes it possible to maintain the well drilling trajectory with maximum accuracy. And the crossing over the Taz River with a diameter of 1220 mm and a length of 2048 m is an unprecedented success object made with such characteristics.The weight of the pipeline structure at the time of pulling through was 2633 tons.

South Stream

Krasnodar region

2015

Customer: OOO "Gazprom invest"

South European Main Gas Pipeline

Transitions made - 2
Total length - 1708 m
Pipe diameter -1420 mm

SP VIS-MOS LLC completed a set of works on the arrangement of underwater crossings across the Zhuravka and Beisug rivers at the facility "Expansion of the UGSS to ensure gas supply to the South Stream gas pipeline. Stage 2 (eastern corridor), to ensure gas supply in the volume up to 63 billion m3/year". South European gas pipeline. Pochinki - Anapa section, km 1379-km 1570.5.2"

Water supply of Vasilyevsky Island

Saint Petersburg

2014-2015

Customer: LLC "Petrokom"

Construction of a water conduit

Transitions made - 2
Total length - 350 m
Pipe diameter - 1000 mm

In the construction of the water supply system to the Western part of Vasilyevsky Island in St. Petersburg, one press-screw unit and two horizontal directional drilling units were involved. To locate drilling complexes on sites in the channel part of the Neva River near Petrovskaya and Arsenalnaya specialists of SP VIS-MOS LLC, two temporary artificial platforms were built to carry the main load.

Arctic - Purpe

Krasnoyarsk region

2013-2014

Customer: JSC "Sibnefteprovod"

Main oil pipeline

Transitions made - 3
Total length - 2967 m
Pipe diameter -1220 mm, 273 mm

The construction of crossings across the Taz River has become one of the most technically complex facilities of the Zapolyarye-Purpe oil pipeline system. start drilling operations before the opening of transport links arranged by winter roads Drilling operations were carried out in permafrost soil, in the conditions of the Arctic, at extremely low temperatures.

Sibur

KhMAO, YaNAO

2012

Customer: Zapsibtransgaz LLC

Completed transitions - 14
Total length - 6500 m
Pipe diameter - 820 mm, 530 mm

The construction of crossings was carried out in a short time using 6 drilling rigs simultaneously.

Vankor group of fields

Yamalo-Nenets Autonomous Okrug

2011-2012

Customer: CJSC "Vankorneft"

Completed transitions - 8
Total length - 7043 m
Pipe diameter - 1220 mm, 820 mm

Drilling operations were carried out in permafrost with high abrasive properties. A drilling tool with special rock-breaking equipment was used for driving. Of particular difficulty was the preparatory period, due to the remoteness of the objects and the need to work in completely autonomous conditions.

Crossing the Eastern Bosphorus Strait

Sakhalin-Khabarovsk-Vladivostok

2010-2011

Customer: LLC "Gazprom gas distribution"

Gas transportation system

Transitions made - 2
Total length - 2857m
Pipe diameter - 426 mm

Super-long crossing. The construction was carried out by two drilling rigs by docking oncoming pilot wells from opposite banks of the obstacle (Russky Island - Nazimov Cape). During the construction process, a modern navigation system was used that allows the wells to see" each other and ensures high docking accuracy. The strength of the overcome soil reached 174 MPa, which is comparable to the strength of metal and required the purchase of a specialized drilling tool from an Australian manufacturer.

Dzhubga-Lazarevskoe-Sochi

Krasnodar region

2009-2010

Customer: LLC "Piter Gaz"

Gasification of Olympic venues

Completed crossings - 5
Total length - 4256 m
Pipe diameter - 762 mm, 325 mm

The work was carried out in cramped conditions of mountainous terrain, on minimal sites, with a large elevation difference, in heavy-duty rocky soils. A particular problem was rock fissuring, local faults, interlayering of rocky and non-cohesive soils. This project involved laying a linear part of the pipeline in the Black Sea , and the connection sections were carried out using the horizontal directional drilling method with an exit point to the sea.

Nord Stream

Leningrad region

2007-2008

Customer: CJSC "Yamalgazinvest"

International project Russia-Germany gas pipeline

Transitions made - 2
Total length - 1835 m
Pipe diameter - 1420 mm

The construction of crossings was carried out in conditions of complex geology, in sandy gravel soil with a high percentage of large boulders. To pass the route, a special rock-cutting drilling tool developed by engineers of SP VIS-MOS LLC was used.

Baltic pipeline system

Vologda, Tver, Yaroslavl regions

2004

Customer: OAO "Baltnefteprovod"

The system of main oil pipelines

Transitions made - 3
Total length - 1607 m
Pipe diameter - 1020 mm

The construction of the crossing under the Uleima River took place in extremely difficult boulder soil, the diameter of the boulders exceeded two meters, which greatly hampered the development of the well. For successful construction, a drilling tool with reinforced rock-breaking elements was manufactured at the production base of LLC SP VIS-MOS.

Blue stream

Krasnodar region

2000-2002

Customer: JSC "Stroytransgaz"

International project Russia-Türkiye gas pipeline

Transitions made - 8
Total length - 6080m
Pipe diameter - 1420 mm

To overcome difficult areas, a unified drilling tool was manufactured at the production base of SP VIS-MOS LLC. To stabilize the well, drilling fluid was selected directly at the construction sites in a mobile laboratory.

Exploration and production drilling

Scout and exploratory drilling using the core method

Deposits Lora and Talnikovaya Olsky district of the Magadan region

2021-2022

Customer: OOO "Nedra M", OOO "MC "Far East"

More than 10,000 linear meters have been drilled and cored.

Core drilling is one of the most productive and economical methods of mine workings. Core core drilling allows determining the depth of the rock with the highest accuracy. When drilling, a point effect on the soil along the radius of rotation occurs, a solid mass of rocks is drilled out without disturbing their structure and condition, which makes it possible to carry out a comprehensive analysis of the studied breed.

Construction of multilateral multidirectional wells

Yakutia

2019-2022

Customer: JSC "Alrosa"

Drilling operations with core sampling and a complex of geophysical surveys during exploration and deep horizons of the Udachnaya pipe

Wells at the Vostochny" ore body - total penetration of 14,200 m

Wells in the "Western" ore body - total penetration of 21,000 m

Wells at the Udachny mine - 1700 m

Construction of multilateral multidirectional wells

Yakutia

2017-2019

Customer: JSC "Alrosa"

Drilling operations with a complex of geophysical surveys in the exploration of deep horizons of the Yubileinaya pipe

Well No. 438, total penetration - 727 8 m.;
Well No. 439, total penetration - 6672 m.
A total of 20 fan exploration shafts were drilled.

Drilling large diameter wells

Tula region, Novomoskovsk rock salt deposit

since 2017

Customer: SC "MHK "EuroChem"

Built - 4 brine wells

The construction of large-diameter wells is in demand by the mining industry for the purpose of degassing and utilizing gases from mines, supplying air to existing mine workings (shafts, adits), as well as for the extraction of minerals that cannot be mined in an open way.

LLC "SP VIS-MOS" has experience in the construction of these wells in difficult geological conditions, including the use of a unique specialized tool.

Construction and development of production and exploration wells

Ulyanovsk, Samara, Amur regions and the Republic of Tatarstan

2016-2022

Customer: NK "Action", JSC "Zarubezhneft", LLC "MNKT", LLC "Gapromgeologorazvedka"

A full range of works on the construction of production, exploration, prospecting and appraisal wells on a turnkey basis has been completed. Our team of specialists has extensive experience in solving complex problems in different climatic conditions, a high level of qualification, and has an extensive knowledge base and database, which allows put objects into operation within the contractual terms and in compliance with the financial interests of the Customer.

Construction of production horizontal wells for the extraction of hard-to-recover reserves (heavy oils and bitumen)

Republic of Komi, Republic of Tatarstan, Samara and Sakhalin regions

2013-2022

Customer: Lukoil Komi LLC, Tatneft PJSC, Rosneft Oil Company, Samaraneftegaz JSC, NNK-Sakhalinmorneftegaz LLC

Built - 170 production and steam injection wells.

The production of heavy oil and bitumen is complicated by their high viscosity, the need to use energy-saving methods of deep mining. The SAGD technology (from the English. Steam Assisted Gravity Drainage - thermogravitational drainage of the reservoir) used by the company SP VIS-MOS" allows you to "warm up" the reservoir and faster, easier to extract the fluid, is innovative and highly cost-effective

Construction of linear facilities

Construction of pipeline transport facilities

Ulyanovsk

2023

Customer: UMUP "Ulyanovskvodokanal"

Overhaul of the centralized water disposal system in Krotovka settlement, Ulyanovsk region.

Construction of pipeline transport facilities

Krasnodar region

2022

Customer: Chernomortransneft LLC

Reconstruction of a section of the main oil pipeline "Tikhoretsk-Tuapse-2".

Construction of pipeline transport facilities

KhMAO

2021-2022

Customer: JSC "Transneft-Siberia"

Reconstruction of the section of the main oil pipeline "Nizhnevartovsk-Kurgan-Kuibyshev" 217 km - 284 km.

Construction of pipeline transport facilities

KhMAO

2021-2022

Customer: JSC "Transneft-Siberia"

Reconstruction of the section of the main oil pipeline "Surgut-Polotsk" 342 km - 380 km.

Construction of pipeline transport facilities

KhMAO

2021-2022

Customer: JSC "SiburTyumenGaz"

Reconstruction of the main product pipeline "Gubkinsky GPP-Yuzhno-Balyksky GPP".

Construction of an additional reserve line 22 km, incl. 10 km in wetlands

Construction of pipeline transport facilities

KhMAO

2020-2022

Customer: RN-Yuganskneftegaz, OOO

Construction of oil pipelines, construction of oil and gas gathering networks at the fields: Ust-Balykskoye, Solkinskoye, Priobskoye, Yuzhno-Surgutskoye, Vostochno-Pravdinskoye. The total length is over 100 km.

Construction of pipeline transport facilities

Krasnoyarsk region

2018

Customer: SUZUN JSC

Construction of infield pipelines.

Construction of pipeline transport facilities

KhMAO

2017

Customer: Gazpromneft-Khantos, OOO

Arrangement of the Maloyugansky site for trial operation. Construction of a pipeline for the oil and gas gathering of the Maloyugansky field.

Construction of pipeline transport facilities

Krasnoyarsk region

2015

Customer: SUZUN JSC

Construction of an interfield oil pipeline OPF of the Suzunskoye field - CPS of the Vankor field

Arrangement of well pads at oil and gas fields

Construction of well pads at the Prirazlomnoye, Priobskoye, Ust-Balykskoye fields

KhMAO

2020-2022

Customer: PJSC "Rosneft"

  • Manufacturing and installation of metal structures (stairs, platforms, sheds, beams, cable racks, floodlight matches, metal heads)
  • Installation of start-up and reception chambers, drainage tanks with piping
  • Installation of cable lines and communication networks
  • Installation of control and automation devices, fire and security alarms
  • Piping of oil wells with output through the metering unit to the main oil pipeline
  • Protection of oil and gas equipment and pipelines from corrosion
  • Improvement of the territory and access roads

Site preparation of well pads and access roads

Engineering preparation of site facilities and access roads of the fields of the Nefteyugansk region

KhMAO

2020-2022

Customer: PJSC "Rosneft"

The total volume of dumping is 5,500,000 cubic meters

  • Clearing the area
  • Backfilling of the base of the well pad or flare system site using soil, sand and crushed stone and compaction
  • Installation of shut-off valves and bunding along the perimeter of the bush, culverts
  • Construction and arrangement of sludge pits with impervious screen
  • Road construction / roadways, infield roads, winter roads