Unique auger drilling technology

The construction uniqueness of the main oil pipeline facility "Tikhoretsk - Novorossiysk - 4" in the Krasnodar Territory is the auger drilling technology, which provides to build oil and gas pipeline crossings without violating the integrity of coatings (roads, railway lines). There are only several special machines for such drilling in our country! It provides to do the job quickly and efficiently in an environmentally friendly manner.
 
Construction of the Krasnodar facility will increase transfer capacity of the oil pipeline, which is strategically important for our country and an infrastructure facility.
Total length of the crossings under construction made by the SP VIS-MOS LLC at this production site through natural and artificial barriers will make up:
-  1800 meters by the horizontal auger drilling,
-  4230 meters by the horizontal directional drilling (HDD).
 
The photo shows the production facility PK 698