Archive by year 2015

  • 01
    nov
    2015
    Completed projects

    Project site: "Reconstruction of trunk pipelines "Tikhoretsk - Novorossiysk". Construction of loopings for the oil pipeline "Tikhoretsk-Novorossiysk-3". Sixth section of construction. LCH NPS-1 "Novovelichkovskaya" - LPDS "Krymskaya".

  • 28
    sep
    2015
    Completed projects

    Project site "Reconstruction of BCS-1,2 at the Orenburgskoe NGKM", code of construction 080. Construction of underwater crossing of DN 1000 mm gas pipeline for unrefined gas (planned length - 590 m) through the river Donguz by the directional drilling me

  • 11
    sep
    2015
    Completed projects

    Project site "Reconstruction of the main pipelines "Tikhoretsk - Novorossiysk". Construction of loopings for the oil pipeline "Tikhoretsk-Novorossiysk-3". The sixth construction site. Linear part of the NPS-1 "Novovelichkovskaya" - LPDS "Krymskaya".

  • 11
    sep
    2015
    Completed projects

    Project site "Reconstruction of the main pipelines "Tikhoretsk - Novorossiysk". Construction of loopings for the oil pipeline "Tikhoretsk-Novorossiysk-3". The sixth construction site. Linear part of the NPS-1 "Novovelichkovskaya" - LPDS "Krymskaya".

  • 11
    sep
    2015
    Completed projects

    Project site: "Pressure oil pipeline from the tie-in point 3 to DNS-5. Reconstruction of the Lukyavinskoe oil field. Crossing through the river Tromyegan.

  • 13
    aug
    2015
    Completed projects

    Project site "Construction of the underwater pipeline crossing D 426*10 through the river Irtysh by the horisontal directional drilling method at the project site "Oil-and-gas gathering networks K46 - the tie-in point US".

  • 14
    jun
    2015
    Completed projects

    Project site: "South Stream. Section "Pochinki-Anapa", 1379 km - 1570,5 km" as a part of construction "Widening of the unified gas supply system for water supply into the gas pipeline "South Stream". (Crossing through the river Beysug).

  • 15
    may
    2015
    Completed projects

    Project site: "Gas pipeline "South Stream". Section "Pochinki - Anapa", km 1379 - km 1570,5" as a part of construction "Development of unified gas supply system for gas supply to the gas pipeline "South Stream". Crossing through the river Zhuravka."

  • 13
    may
    2015
    Completed projects

    The production well №12343. Construction of production wells at the Ashalchinskoe field of superviscous oil in the Almetyevsky region of the Republic of Tatarstan.

  • 16
    apr
    2015
    Completed projects

    Project site "Gas pipeline from the automated gas distribution station "Urozhay-30" to the automated gas distribution station "Urozhay-25", underwater crossing through the river Ayvasedo-Pur by the HDD method". (main line).

  • 14
    apr
    2015
    Completed projects

    Project site "Processing capacity increase of the main product pipeline "Vtoroe - Primorsk" at the existing section "Vtoroe - Yaroslavl". Reconstruction of the oil transfer pumping station "Zalesie" №2. Press auger boring method.

  • 13
    apr
    2015
    Completed projects

    Project site "Gas pipeline from the automated gas distribution station "Urozhay-30" to the automated gas distribution station "Urozhay-25", underwater crossing through the river Ayvasedo-Pur by the HDD method". Reaerve line.

  • 10
    apr
    2015
    Company news

    The “SP VIS-MOS” LLC has set a new world record having built the northernmost crossing in the world by the horizontal directional drilling method.

    The “SP VIS-MOS” LLC has set a new world record having built the northernmost crossing in the world by the horizontal directional drilling method.

    http://www.gazprom-neft.ru/press-center/news/1106801/

    http://www.rosneft.ru/news/news_in_press/07042015.html

  • 10
    apr
    2015
    Completed projects

    Project site: "Construction of the Zapadno-Messoyakhskoe field. Pressure oil pipeline of the CPF Vostochno-Messoyakhskoe field - Pipeline commisioning station"). Underwater crossing through the river Indikyakha by the HDD method. Casing and pipe".

  • 05
    apr
    2015
    Completed projects

    Project site "Construction of underwater crossing through the river Usa at the project site of the "Lukoil-Komi" LLC. Reserve line".

  • 05
    apr
    2015
    Completed projects

    Project site: "Gas pipeline from the automated gas distribution station "Urozhay-30" to the automated gas distribution station "Urozhay-25". Underwater pipeline crossing through the lake by the HDD method."

  • 01
    apr
    2015
    Completed projects

    Project site "Processing capacity increase of the main product pipeline "Vtoroe - Primorsk" at the existing section "Vtoroe - Yaroslavl". Reconstruction of the oil transfer pumping station "Zalesie". Press auger boring method.

  • 27
    mar
    2015
    Completed projects

    Project site: "Gas pipeline from the automated gas distribution station "Urozhay-30" to the automated gas distribution station "Urozhay-25". Underwater pipeline crossing through the Senzayakha river by the HDD method."

  • 22
    mar
    2015
    Completed projects

    Project site: "Gas pipeline from the automated gas distribution station "Urozhay-30" to the automated gas distribution station "Urozhay-25". Underwater pipeline crossing through the lake Okunevoe by the HDD method."

  • 19
    mar
    2015
    Company news

    On March 19, 2015 drillers of the “SP VIS-MOS” LLC has successfully completed the latest ambitious project

    On March 19, 2015 drillers of the “SP VIS-MOS” LLC has successfully completed the latest ambitious project – they have pulled the main line of underwater main gas pipeline under the river Lena Ø530 mm 1040 m long in the Republic of Sakha Yakutia at the project site "Underwater crossing of main gas pipeline through the river Lena for gasification of the Zarechnie Ulusy of the Republic of Sakha (Yakutia). Reconstruction of gas pipeline on the item PK88+50-PK101"

  • 19
    mar
    2015
    Completed projects

    Project site "Underwater crossing of the main gas pipeline through the river Lena for gasification of Zarechny Ulus RS (Ya) (the main line). Reconstruction of the gas pipeline on the section PK88+50 - PK101".

  • 13
    mar
    2015
    Completed projects

    Project site "Oil pipeline of Nizhnevartovsk - Kurgan - Kuibyshev. Upper reserve line 87 km - 111,3 km (24,3 km long) D=1020 mm. Pipe exchange on the underwater crossing through the channel Lokosovskaya, 106 km.

  • 06
    mar
    2015
    Completed projects

    Project site "Construction of underwater crossing through the river Usa at the project site of the "Lukoil-Komi" LLC. Main line".

  • 02
    mar
    2015
    Completed projects

    Project site "Gas pipeline "Varyeganskaya KS - Vyngapurovsky GPZ" crossing through the river Agrnyegan (PK11+82 - PK16+04)".

  • 26
    feb
    2015
    Completed projects

    Project site "Main oil pipeline Gorky - Yaroslavl, DN800. Exchange of sections 235-269 km. Reconstruction." Press auger boring.

  • 26
    feb
    2015
    Completed projects

    Project site "Construction of the Yarudeyskoe oil field for a period of test operation. External transport. Oil pipeline. Gas pipeline." Crossing through the river Nadym.

  • 25
    feb
    2015
    Completed projects

    Project site "Oil pipeline NBUV / 251-264/ Oil pipeline NBUV /264-279/ DN=700mm. Reserve line. Pipe exchange on the sections 254,416 - 255,28 km, 259,5 - 274,47 km. Nefteyuganskoe UMN. Reconstruction".

  • 24
    feb
    2015
    Completed projects

    The production well №12347. Construction of production wells at the Ashalchinskoe field of superviscous oil in the Almetyevsky region of the Republic of Tatarstan.

  • 07
    feb
    2015
    Completed projects

    Project site "Main oil pipeline Gorky - Yaroslavl, DN800. Exchange of sections 235-269 km. Reconstruction." Press auger boring.

  • 24
    jan
    2015
    Completed projects

    Project site "Main oil pipeline Gorky - Yaroslavl, DN800. Exchange of sections 235-269 km. Reconstruction." Press auger boring.

  • 14
    jan
    2015
    Completed projects

    Project site "Construction of the Yarudeyskoe field for the period of test production. External transport. Oil pipeline. Gas pipeline. (Purpe river)".

  • 10
    jan
    2015
    Completed projects

    Project site "Construction of well clusters № 518 BIS, 685, 700, 705 of the Malobalykskoe field. High pressure water conduit. Block valve station №22 – block valve station №23. Crossing through the railroad by the HDD method".

  • 06
    jan
    2015
    Completed projects

    The production well № 13020. Construction of production wells at the Ashalchinskoe field of superviscous oil in the Almetyevsky region of the Republic of Tatarstan.

  • 04
    jan
    2015
    Completed projects

    The production well №12336. Construction of production wells at the Ashalchinskoe field of superviscous oil in the Almetyevsky region of the Republic of Tatarstan. The production well № 13024

Archive