Archive by year 2014

  • 31
    dec
    2014
    Completed projects

    Project site "Construction of well clusters № 518 BIS, 685, 700, 705 of the Malobalykskoe field. Oil and gas collecting system. Tie-in point of the well cluster №700-DNS-2. Crossing through the railroad by the HDD method."

  • 20
    dec
    2014
    Completed projects

    Project site High-pressure water conduit. Tie-in point at the well cluster №6 - tie-in point at the well cluster №10. The Zapando-Ugutskoe field (Sukhaya river)

  • 15
    dec
    2014
    Completed projects

    Project site: "Crossing through a rail road by the HDD method "High-pressure water conduit item 2 - well cluster 586". Malobalykskoe field".

  • 15
    dec
    2014
    Completed projects

    Project site: "TPR item 1.1.2 "Main oil pipeline Gorky - Yaroslavl, DN 800. Replacement of a section 127-142 km. Reconstruction." Press auger boring.

  • 14
    dec
    2014
    Completed projects

    Construction of production wells at the Ashalchinskoe field of superviscous oil in the Almetyevsky region of the Republic of Tatarstan. The production well № 13023

  • 21
    oct
    2014
    Completed projects

    Reconstruction of linear part of main gas pipeline "Central Asia - Center" on the section of the "Volgogradtransgaz" LLC. Crossing of the gas pipeline through the Khoper river.

  • 18
    oct
    2014
    Completed projects

    Project “Main pipeline “Surgut-Polotsk”. Length 100 through the Lazh River 1705 km. Regional Oil Pipeline Management in Mari El. Reconstruction”.

  • 12
    oct
    2014
    Completed projects

    Project "Construction of production wells at the Ashalchinskoe field of superviscous oil in the Almetyevsky region of the Republic of Tatarstan. The production well № 15010"

  • 09
    oct
    2014
    Completed projects

    Project “Reconstruction of the main pipeline site “Kuybyshev-Lisichansk” through the irrigation channel,

  • 06
    oct
    2014
    Completed projects

    Construction of production wells at the Ashalchinskoe field of superviscous oil in the Almetyevsky region of the Republic of Tatarstan. The production well № 15117.

  • 29
    sep
    2014
    Company news

    "SP VIS-MOS" LLC has participated in the Second Annual International Conference "TUNNELS AND TRENCHLESS CROSSINGS DESIGN" (St. Petersburg).

    "SP VIS-MOS" LLC represented by engineer supervisor I.A. Shelkov, Deputy CEO for Production, participated in II Annual International Conference "TUNNELS AND TRENCHLESS CROSSINGS DESIGN" held 24 – 26 September 2014, St. Petersburg.
  • 16
    sep
    2014
    Completed projects

    Construction of production wells at the Ashalchinskoe field of superviscous oil in the Almetyevsky region of the Republic of Tatarstan. The production well № 15118

  • 27
    aug
    2014
    Completed projects

    Gas pipeline "Gas-compression station Izobilny - Nevinnomyssk, 45 km". First start-up complex, section №2.

  • 27
    jul
    2014
    Completed projects

    Gas pipeline “KS (compressor station) Izobilniy - Nevinnomyssk, km 98,6 - km 43,4.

  • 11
    jun
    2014
    Company news

    On July 11, 2014 the SP VIS-MOS company has celebrated its 20th anniversary.

    All workers of the company and great number of guests also from abroad attended this celebration…
  • 18
    may
    2014
    Completed projects

    Project site - Gas pipeline "KS (compressor station) Izobilniy - Nevinnomyssk, 94 km.

  • 14
    apr
    2014
    Completed projects

    Facility "Pipeline system "Zapolyarye - NPS "Pur-Pe". Third stage. Section from the GNPS №1 to NPS №2. Stage 2.

  • 14
    apr
    2014
    Company news

    Construction of the crossing under the Taz river within the construction project of the main oil pipeline “Pipeline system “Zapolyarye – NPS Purpe” is completed.

    Construction of the crossing under the Taz river within the construction project of the main oil pipeline “Pipeline system “Zapolyarye – NPS Purpe” is completed.

    http://sibnefteprovod.transneft.ru/press/news/?id=9371

    Drillers of the “SP VIS-MOS” LLC has completed pulling through process of the bottom pipe of reserve line through the Taz river within construction of the project Main oil pipeline “Pipeline system “Zapolyarye – NPS Pur-pe”. Previously the main line was pulled through on April 01, 2014.

  • 14
    apr
    2014
    Completed projects

    Facility "Pipeline system "Zapolyarye - NPS "Pur-Pe". Third stage.

  • 11
    apr
    2014
    Completed projects

    Vostochno-Tarkosalinskoe field. Oil-field. Central section. Linear facilities. First stage of construction.

  • 10
    apr
    2014
    Completed projects

    Complex of construction and installation works in crossing’s development by means of horizontal directional drilling method through the river Bolshoy Salym at the project site “Product pipeline “Yuzhno-Balykskaya head pumping station – Tobolsk-Neftekhim”.

  • 07
    apr
    2014
    Completed projects

    Project site «The Severo-Khancheysky license area: Gas pipeline of external gas transfer from PGPT of the Severo-Khancheyskoe field to CPF of the Vostochno-Tarkosalinskoe gas field. Tayakha river».

  • 07
    apr
    2014
    Completed projects

    Project site «The Severo-Khancheysky license area: Gas pipeline of external gas transfer from PGPT of the Severo-Khancheyskoe field to CPF of the Vostochno-Tarkosalinskoe gas field.

  • 07
    apr
    2014
    Completed projects

    Project site: Oil pipeline CPF Yarudeyskoe field - Pipeline acceptance station, area of NPS Purpe.

  • 06
    apr
    2014
    Completed projects

    Complex of construction and installation works in crossing’s development by means of horizontal directional drilling method through the river Bolshoy Salym at the project site “Product pipeline “Yuzhno-Balykskaya head pumping station – Tobolsk-Neftekhim”.

  • 05
    apr
    2014
    Completed projects

    Project site - Crossing through the railways. Pressure oil pipeline, knot 13-40.

  • 05
    apr
    2014
    Completed projects

    Project site «The Severo-Khancheysky license area: Gas pipeline of external gas transfer from PGPT of the Severo-Khancheyskoe field to CPF of the Vostochno-Tarkosalinskoe gas field. Lake (water bottom pit)».

  • 03
    apr
    2014
    Completed projects

    Project site «Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 03
    apr
    2014
    Completed projects

    Project site: Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 03
    apr
    2014
    Completed projects

    Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 01
    apr
    2014
    Completed projects

    Facility "Pipeline system "Zapolyarye - NPS "Pur-Pe". Third stage. Section from the GNPS №1 to NPS №2. Stage 2.

  • 30
    mar
    2014
    Completed projects

    Project site «The Severo-Khancheysky license area: Gas pipeline of external gas transfer from PGPT of the Severo-Khancheyskoe field to CPF of the Vostochno-Tarkosalinskoe gas field. Underwater crossing through the river Alipokaptylyakha».

  • 30
    mar
    2014
    Completed projects

    Project site: Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 30
    mar
    2014
    Completed projects

    Project site: Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 30
    mar
    2014
    Completed projects

    Project site: Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 23
    mar
    2014
    Completed projects

    Project site: Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 23
    mar
    2014
    Completed projects

    Project site: Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 20
    mar
    2014
    Completed projects

    Project site: Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 16
    mar
    2014
    Completed projects

    Project site: Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 14
    mar
    2014
    Completed projects

    Project site "Pressure oil pipeline UP ZD - DNS VS Fainskoe oil field. Crossing of pressure oil pipeline through the channel Yuganskaya Ob' by the directinal drilling method".

  • 10
    mar
    2014
    Completed projects

    Oil pipeline of the CPF Yarudeyskoe field – Pipeline acceptance station in the area of the oil transfer pumping station “Purpe”. Crossing made by the directional drilling method through the river Yarudey.

  • 09
    mar
    2014
    Completed projects

    Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation. Condensate pipeline. Underwater crossing through the river Kettylky.

  • 03
    mar
    2014
    Completed projects

    Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation. Underwater crossing through the river Kettylky.

  • 01
    mar
    2014
    Completed projects

    Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation. Kondensate pipeline and fiber optic communication line. Underwater crossing through the river Taz – Staritsa.

  • 24
    feb
    2014
    Company news

    Builders of the “SP VIS-MOS” company continue drilling works on the Taz river within the large-scale project for construction of the main oil pipeline "Pipeline system "Zapolyarye – NPS Purpe".

    Builders of the “SP VIS-MOS” company continue drilling works on the Taz river within the large-scale project for construction of the main oil pipeline "Pipeline system "Zapolyarye – NPS Purpe".

    On February 17, 2014 reporters has visited builders and got to know how the works are moving forward.

  • 20
    feb
    2014
    Completed projects

    Project site "Pressure oil pipeline UP ZD - DNS VS Fainskoe oil field. Crossing of pressure oil pipeline through the channel Yuganskaya Ob' by the directinal drilling method".

  • 20
    feb
    2014
    Completed projects

    Project site "Pressure oil pipeline UP ZD - DNS VS Fainskoe oil field. Crossing of pressure oil pipeline through the channel Yuganskaya Ob' by the directinal drilling method".

  • 17
    feb
    2014
    Completed projects

    Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 16
    feb
    2014
    Completed projects

    Arrangement of the Thermokarstovoe gas-condensate field for a period of commercial operation.

  • 12
    feb
    2014
    Completed projects

    Project site "Replacement of the section "MN "Surgut-Polotsk" diameter 1000 mm, 2043-2046. Mariyskaya RNU. Reconstruction. Crossing through the river Nyuzhma".

  • 10
    feb
    2014
    Completed projects

    Project site "Reconstruction of the section of MN "Kuybyshev-Unecha-Mozyr-1". 172-202 km. Crossing of trunk pipeline through the automobile road "Moscow-Samara". PK 263+00 - PK 265+60".

  • 26
    jan
    2014
    Completed projects

    Project site "Reconstruction of a section of the Main oil pipeline "Kuibyshev-Unecha-Mozyr-1".

  • 25
    jan
    2014
    Completed projects

    Project site "Arrangement of thermokarst gas-condensate field for a period of commercial operation.

  • 24
    jan
    2014
    Completed projects

    Pipeline system "Zapolyarie - NPS "Pur-Pe"

  • 19
    jan
    2014
    Completed projects

    The project site. "Set of construction and installtion works in arrangement of the crossing by the directional drilling method through the Bolshoy Balyk river on the project site "Yuzhno-Balykskaya head pumping station - Tobolsk-Neftekhim"

  • 15
    jan
    2014
    Completed projects

    The project site. Set of construction and installtion works in arrangement of the crossing by the directional drilling method through the Bolshoy Balyk river on the project site "Yuzhno-Balykskaya head pumping station - Tobolsk-Neftekhim"

  • 10
    jan
    2014
    Completed projects

    The project site "Arrangement of multiple-well platforms No. 82a, 826, 101 of the Ust-Kharampurskoe deposit. Underwater crossings through the river Kharampur by the HDD method. Reserve line."

  • 01
    jan
    2014
    Completed projects

    The project site "Arrangement of multiple-well platforms No. 82a, 826, 101 of the Ust-Kharampurskoe deposit. Underwater crossings through the river Kharampur by the HDD method. Main line.

Archive