    The project site "Arrangement of multiple-well platforms No. 82a, 826, 101 of the Ust-Kharampurskoe deposit. Underwater crossings through the river Kharampur by the HDD method. Main line.

  • 02
    dec
    2013

    Project site - Gas pipeline "KS (compressor station) Izobilniy - Nevinnomyssk, 94 km.

  • 01
    dec
    2013
    Completed projects

    The project site "Reconstruction of the system of reception water pipelines of the formation pressure maintenance department.

  • 27
    nov
    2013
    Completed projects

    Project site: "Reconstruction of main gas pipeline "Maikop - Samurskaya - Sochi". Section 125 - 192 km. Gas pipeline undergroung crossing under the automobile road "Golovinka settlement - Maliy Kichmay village".

  • 10
    nov
    2013
    Completed projects

    The project site "Gas pipeline - bend from the gas pipeline 'Dzhubga - Lazarevskoe - Sochi' to the Tuapsinsky oil refinery plant. Closed installation of casing jacket ?1200 mm.

  • 23
    oct
    2013
    Completed projects

    Capital repairs of gas pipeline - bent to the regional centre Krasny Yar and the automated gas distribution station "Energiya-1". Section 19-26 km. Underwater crossing through the Algarka river by the HDD method.

  • 20
    oct
    2013
    Completed projects

    Capital repairs of gas pipeline - bent to the regional centre Krasny Yar and the automated gas distribution station "Energiya-1". Section 19-26 km. Underwater crossing through the Alcha river by the HDD method.

  • 14
    oct
    2013
    Completed projects

    "Sewege collectors in the central part of Sochi (reconstruction). Actions: "Bringing the utility networks and supply lines to the borders of land property intended for placement of the Olympic facilities".

  • 12
    oct
    2013
    Completed projects

    Capital repairs of gas pipeline - bent to the regional centre Krasny Yar and the automated gas distribution station "Energiya-1". Section 19-26 km. Underwater crossing through the Algarka river by the HDD method.

  • 04
    oct
    2013
    Completed projects

    "Сapital repairs of the gas pipeline - bend to the regional centre Krasny Yar and Automated gas distribution station "Energy-1". Underwater crossing through the river Karaulnaya by the HDD method".

  • 03
    oct
    2013
    Completed projects

    Product pipeline "Yuzhno-Balykskaya head pumping station"- "Tobolsk-Neftehim". The crossing through the highway "Surgut - Ugut" using HDD method.

  • 01
    oct
    2013
    Completed projects

    "Сapital repairs of the gas pipeline - bend to the regional centre Krasny Yar and Automated gas distribution station "Energy-1". Section 19-26 km. Underwater crossing through the artificial lakes and automobile roads by the HDD method".

  • 28
    sep
    2013
    Completed projects

    "Сapital repairs of the gas pipeline - bend to the regional centre Krasny Yar and Automated gas distribution station "Energy-1". Section 19-26 km. Underwater crossing through the river Mayachnaya by the HDD method".

  • 26
    sep
    2013
    Completed projects

    Cable crossing through the river Ob' US Chulym - US Sokur. New construction.

  • 24
    sep
    2013
    Completed projects

    Product pipeline "Yuzhno-Balykskaya head pumping station"- "Tobolsk-Neftehim". The crossing of product pipeline through the highway "Surgut - Ugut" using HDD method.

  • 06
    sep
    2013
    Completed projects

    Cable crossing through the river Ob' US Chulym - US Sokur. New construction.

  • 31
    aug
    2013
    Completed projects

    Cable crossing through the river Ob' US Chulym - US Sokur. New construction.

  • 20
    aug
    2013
    Company news

    The “SP VIS-MOS” LLC in the person of the Deputy General Director – Chief engineer Ivan A. Shelkov has taken part in a corporate meeting of the “Gazprom” OAO in Nizhny Novgorod

    The “SP VIS-MOS” LLC in the person of the Deputy General Director – Chief engineer Ivan A. Shelkov has taken part in a corporate meeting of the “Gazprom” OAO in Nizhny Novgorod, that was held on August 20-23, 2013 in the matter of “Provision of reliable operation of underwater main pipelines (crossings). Successful practices and problems".

    gasprom_en.png   

  • 10
    aug
    2013
    Completed projects

    "Product pipeline "Purovsky ZPK — Yuzhno-Balykskaya head pump station".

  • 28
    jun
    2013
    Completed projects

    Water supply system construction to the Western part of the Vasiyevsky island, including design and exploration work, as well as water conduit construction from GVS to TEC-7 and marine embarkment of the Vasilyevsky island

  • 27
    jun
    2013
    Completed projects

    Pressure oil pipeline of the CPF of the Vyngapurovsky oilfield UPSV - Pogranichnoe field, crossing through the passageway of trunk pipelines. PK 19/1019 - PK 15/1023.

  • 23
    jun
    2013
    Completed projects

    "Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Noyabrskaya head pumping station - Yuzhno-Balykskaya head pumping station".

  • 22
    jun
    2013
    Company news

    For development and strengthening of international cooperation the "SP VIS-MOS" LLC together with colleagues from the Republic of Bulgaria has created in June, 2013 the joint venture "SOF-VIS-MOS" LLC.

    For development and strengthening of international cooperation the "SP VIS-MOS" LLC together with colleagues from the Republic of Bulgaria has created in June, 2013 the joint venture "SOF-VIS-MOS" LLC. The company will execute engineering and construction and installation work within the set of operations of horizontal directional drilling (HDD) as well as directly build crossings by the HDD method in the territory of Bulgaria.
  • 20
    jun
    2013
    Company news

    The "SP VIS-MOS" LLC has become an exclusive distributor of Prime Drilling GmbH for sale of multifunctional directional drill rigs (MDD-rig) in the territory of Russia and CIS countries.

  • 29
    may
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Purovsky ZPK - Noyabrskaya GNS". Crossing of product pipeline through the utility line area 304 km.

  • 06
    may
    2013
    Completed projects

    Product pipeline "Purovsky ZPK — Yuzhno-Balykskaya head pumping station". Stage "Purovsky ZPK - Noyabrskaya GNS". Closed casing installation ?820 mm.

  • 04
    may
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Purovsky ZPK - Noyabrskaya GNS". Site for air pollution control on the intersection through the railway line on the item of 289 km.

  • 01
    may
    2013
    Completed projects

    Linear part along the route of power line 10 kW in the limits of 35 kW. Section №2 of the Noyabrskaya GNS - 254 km.

  • 26
    apr
    2013
    Completed projects

    Extension of the "Yurkharovskoe deposit - Purovsky ZPK" condensate pipeline. Fire pump station with infrastructure facilities. High-voltage line 110 kW with electrical substation 110 kW. Loop lines.

  • 26
    apr
    2013
    Completed projects

    Project site: "System for gas recovery from the southern group of oil-and-gas deposits of the TPP "Lukoil - Ukhtaneftegaz".

  • 24
    apr
    2013
    Completed projects

    Project site: "Arrangement of the Termokarstovoe gas-condensate deposit for the period of industrial operation."

  • 24
    apr
    2013
    Completed projects

    DNS from the preliminary water removal unit, well cluster 354 of the Priobskoe oil deposit". Underwater gas pipeline crossing of petroleum gas through the Kedrovaya river made by the directional drilling method.

  • 23
    apr
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Purovsky ZPK - Noyabrskaya GNS".

  • 19
    apr
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Crossing through the railway line and automobile road PK 22+80.21 - PK 25+30.21 by the directional drilling method

  • 18
    apr
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Purovsky ZPK - Noyabrskaya GNS".

  • 15
    apr
    2013
    Completed projects

    "Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Purovsky ZPK - Noyabrskaya head pumping station". Crossing through the oil pipeline PK 2858+85,0 - PK 2868+20 by press auger boring method.

  • 14
    apr
    2013
    Completed projects

    Project site: "Arrangement of the Termokarstovoe gas-condensate deposit for the period of industrial operation."

  • 13
    apr
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Purovsky ZPK - Noyabrskaya GNS". Underwater crossing of the product pipeline through the Khylmigyakha river by the directional drilling method.

  • 10
    apr
    2013
    Completed projects

    Project site: "DNS from the preliminary water removal unit, well cluster 354 of the Priobskoe oil deposit".

  • 09
    apr
    2013
    Completed projects

    Project site: "Arrangement of the Thermokarskoe gas-condensate oil field for the period of commercial operation.

  • 07
    apr
    2013
    Completed projects

    Project site: "Preliminary water removal unit at the DNS of the Ombinskoe oil field. Gas pipeline DNS of the Ombinskoe oil field. Gas pipeline DNS Ombinskoe - UZA №40". Crossing through the railway line by the directional drilling method.

  • 01
    apr
    2013
    Completed projects

    Project site: "Product pipeline "Purovsky ZPK-Yuzhno-Balykskaya head pumping station".

  • 28
    mar
    2013
    Completed projects

    Project site "Arrangement of the Termokarstovoe gas-condensate deposit for the period of industrial operation.

  • 27
    mar
    2013
    Company news

    On March 27-28 the “SP VIS-MOS” company took part in the XII annual Conference of the enterprises members of the International Association of the specialists in horizontal directional drilling.

    On March 27-28, 2013 the “SP VIS-MOS” company took part in the XII annual Conference of the enterprises members of the International Association of the specialists in horizontal directional drilling (MAS GNB) that was held in the sanatorium “Bor” near Moscow http://www.masgnb.ru/events/news/466 

    The president of the group of companies “SP VIS-MOS” Alexander A. Mayer has made a report about up-to-date condition of the industry sector.

  • 24
    mar
    2013
    Company news

    "SP VIS-MOS" company will take part in the XII Annual Conference of the member enterprises of the International Association of HDD specialists

  • 20
    mar
    2013
    Completed projects

    Oil and gas gathering networks. Tie-in points, well clusters № 1, 2. Mamontovskoe deposit - DNS "Ombinskaya". Crossing made by the directional drilling method through the rail road on the item 648 km PK 4+51.

  • 14
    mar
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Noyabrskaya GNS - Yuzhno-Balykskaya GNS".

  • 13
    mar
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Noyabrskaya GNS - Yuzhno-Balykskaya GNS". Underwater crossing through the Voloktoyagun river.

  • 01
    mar
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Purovsky ZPK - Noyabrsky GNS". Closed installation of casing.

  • 21
    feb
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Noyabrskaya GNS - Yuzhno-Balykskaya GNS". Underwater crossing through the river Tromyegan, 281 km.

  • 18
    feb
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Section "Noyabrskaya head pumping station - Yuzhno-Balykskaya pumping station". Automobile road "Khanymey - Muravlevo".

  • 18
    feb
    2013
    Company news

    Winner of the tender

    The "SP VIS-MOS" LLC is pronounced the winner of procurement according to the lot of the OAO “AK “Transneft” No. 3P-16-SNP/IP/3.4-0.3.2013 “Trunk line submerged crossing through the Taz river. Channel section” (OAO “Sibnefteprovod” 2013).
  • 18
    feb
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". Stage "Noyabrskaya GNS - Yuzhno-Balykskaya GNS". Underwater crossing through the river Tromyegan, 219 km.

  • 17
    feb
    2013
    Completed projects

    Project site "Main oil pipeline "Gorky-Ryazan-2". Crossing through the river Tesha, 107 km. Reconstruction.

  • 08
    feb
    2013
    Completed projects

    Project site "Underwater section "Main gas pipeline Ukhta-Torzhok" (first stage) on the crosiing through the river Vychegda (km 1411) PK 576+62 - PK 588+60 and PK 21+00 - PK 33+64 (reserve line) by the directional drilling method.

  • 08
    feb
    2013
    Completed projects

    Product pipeline “Purovsky condensate recycling plant – Yuzhno-Balykskaya head pumping station”. Stage “Noyabrskaya GNS – Yuzhno-Balykskaya GNS”. Closed casing laying. Automobile road “Noyabrsk city – Vyngapurovsky settlement”.

  • 04
    feb
    2013
    Completed projects

    Construction of water supply system to the Western part of the Vasilyevsky island including design and exploration works as well as water conduit construction from the DHW to the TEC-7 and Sea embarkment of the Vasolyevsky osland

  • 03
    feb
    2013
    Completed projects

    Project site "Underwater section "Main gas pipeline Ukhta-Torzhok" (first stage) on the crosiing through the river Vychegda (km 1411) PK 576+62 - PK 588+60 (main line) by the directional drilling method.

  • 03
    feb
    2013
    Completed projects

    Product pipeline "Purovsky ZPK - Yuzhno-Balykskaya head pumping station". The stage "Purovsky ZPK — Noyabrskaya head pumping station". Underwater crossing through the river Purpe.

  • 19
    jan
    2013
    Completed projects

    Replacement of the sections of linear part of the main oil pipeline "Lisichansk - Tikhoretsk-1". Section 11.