Archive by year 2011

  • 20
    nov
    2011
    Completed projects

    "Gas pipeline bend and GRS Vyksa, Nizhegorod region (code of construction 928), river Shiloksha

  • 01
    nov
    2011
    Completed projects

    "Pipe exchange on the MN "Yaroslavl - Kirishi-1, 0-9 km YaRNU. Reconstruction"

  • 08
    oct
    2011
    Completed projects

    Field pipelines. Section T.3S-T.5S. Underwater crossing construction by the HDD method through the river Bolshaya Khetta. Hign pressure water conduit (main line -1 and main line 2) and field pipelines. Section T.3S - T.5S.

  • 20
    sep
    2011
    Completed projects

    Field pipelines. Section T.3S-T.5S. Underwater crossing construction by the HDD method through the river Bolshaya Khetta. Hign pressure water conduit (main line -1 and main line 2) and field pipelines. Section T.3S - T.5S.

  • 01
    sep
    2011
    Completed projects

    The inter-settlement gas pipeline from gas distribution station of Vladivostok to the consumers of natural gas of the Russky island with the bend to the TEC-2 of Vladivostok city, the Primorsky Krai. Code 125-09 - 3/01.

  • 16
    aug
    2011
    Completed projects

    The inter-settlement gas pipeline from gas distribution station of Vladivostok city to the consumers of natural gas of the Russky island with the bend to the TEC-2 of Vladivostok city, the Primorsky Krai. Code 125-09 - 3/01.

  • 11
    aug
    2011
    Completed projects

    Field pipelines. Section T.3S-T.5S. Underwater crossing construction by the HDD method through the river Bolshaya Khetta. Hign pressure water conduit (main line -1 and main line-2) and field pipelines. Section T.3S - T.5S.

  • 24
    jul
    2011
    Completed projects

    Field pipelines. Section T.3S-T.5S. Underwater crossing construction by the HDD method through the river Bolshaya Khetta. Hign pressure water conduit (main line -1 and main line-2) and field pipelines. Section T.3S - T.5S.

  • 27
    may
    2011
    Completed projects

    Gas pipeline reconstruction DNS Asomkinskaya - DNS Vistochno-Surgutskoe oil field (inv. 302770) by the HDD method through the Yugaskaya Ob channel

  • 07
    may
    2011
    Completed projects

    Ejection of the MNPP "Omsk - Sokur" (main product pipelines) from the area of the Zaelzovsky pine forest, crossing through the pond

  • 27
    apr
    2011
    Completed projects

    Gas pipeline Pravdinskaya KS (pump station) - Yuzhno-Balykskaya GPK (gas treatment plant). Second start-up complex. Second stage of construction. HDD (Pravdinskoe) 08-231\466-06.

  • 21
    apr
    2011
    Completed projects

    Gas pipeline Pravdinskaya KS (pump station) - Yuzhno-Balykskaya GPK (gas treatment plant). Second start-up complex. Second stage of construction. HDD (Pravdinskoe) 08-231\466-06.

  • 16
    apr
    2011
    Completed projects

    Ejection of the MNPP "Omsk - Sokur" (main product pipelines) from the area of the Zaelzovsky pine forest, crossing, Ob river (reserve line)

  • 29
    mar
    2011
    Completed projects

    Oil pipeline Knot 1 (DNS (booster pump station) region k-201) - Knot 9 (CPF-7). Priobskoe oil field "Underwater crossing through the channel Chebykovskata, d 820 (530), by the HDD method

  • 12
    mar
    2011
    Completed projects

    Ejection of the MNPP "Omsk - Sokur" (main product pipelines) from the area of the Zaelzovsky pine forest, Ob river (main line)

  • 01
    mar
    2011
    Completed projects

    Crossing through the rail road "Bezenchuk - Kinel"

  • 16
    feb
    2011
    Completed projects

    Gas pipeline Severo-Vasyuganskoe GKM - Myldzhinskoe GKM (gas condensate field). Underwater crossing through the Vasyugan river, D 325 * 12 mm, length - 312,7 m (main line)

  • 12
    feb
    2011
    Completed projects

    Gas pipeline Severo-Vasyuganskoe GKM - Myldzhinskoe GKM (gas condensate field). Underwater crossing through the Vasyugan river, D 325 * 12 mm, length - 312,7 m (reserve line)

  • 05
    feb
    2011
    Completed projects

    Oil and gas gathering networks. Sections from tie-in points 3, 4, 5 to the tie-in point 245. Underwater crossing through the Ob river by the HDD method

  • 31
    jan
    2011
    Completed projects

    Gas pipeline Severo-Vasyuganskoe GKM - Myldzhinskoe GKM (gas condensate field). Underwater crossing through the Nyurolka river by the HDD method, D 325 * 12 mm, length - 357,6 m (reserve line)

Archive