The Vankorskaya group of deposits

The Vankorskaya group of deposits

ObstacleDiameter, mmLength, mCustomer
River Taz, oil pipeline8201557 ZAO “Vankorneft”
River Taz, oil pipeline 8201559 ZAO “Vankorneft”
River Bolshaya Khetta, oil pipeline1220747 ZAO “Vankorneft”
River Bolshaya Khetta, oil pipeline 1220744 ZAO “Vankorneft”
River Bolshaya Khetta, water conduit 820626 ZAO “Vankorneft”
River Bolshaya Khetta, water conduit 820628 ZAO “Vankorneft”
River Lodochnaya, gas pipeline 820713 ZAO “Vankorneft”
River Russkaya, gas pipeline 820469 ZAO “Vankorneft”

Drill works were conducted in the conditions of ever-frozen grounds with highly abrasive properties. The drilling tool applied for driving was equipped with special rock cutting equipment.

Preparatory period was especially complicated because of remoteness of sites and necessity to work in absolutely autonomous conditions, it was necessary to organize and provide drilling facilities with expendables so that the work could be carried out trouble free during the whole period of the project realization.

Construction was completed in specified terms in full compliance with contractual requirements and according to the engineering documentation.