Northern Stream

Obstacle | Diameter, mm | Length, m | Customer |
River Sheksna | 1420 | 1040 | ZAO «Yamalgazinvest» |
River Volkhov | 1420 | 795 | ZAO «Yamalgazinvest» |
Crossings construction was carried out in the conditions of difficult geology, in sandy gravel soil with high percentage of large boulders. For passing of this route special rock cutting drilling tool was applied which was developed by the engineers of the LLC “SP VIS-MOS”.