Northern Stream

Northern Stream
ObstacleDiameter, mmLength, mCustomer
River Sheksna14201040 ZAO «Yamalgazinvest»
River Volkhov 1420795 ZAO «Yamalgazinvest»

Crossings construction was carried out in the conditions of difficult geology, in sandy gravel soil with high percentage of large boulders. For passing of this route special rock cutting drilling tool was applied which was developed by the engineers of the LLC “SP VIS-MOS”.